Sampling Of Power Plant Systems
Sampling Of Power Plant Systems
Sampling Of Power Plant Systems

Sampling Of Power Plant Systems

Lead Time: 1-5 days

MOQ: 1 Container

*Price not included. Please contact the seller for inquiries.

تهران (تهران)

Business Type

Trading

Year Established

2004

Employees

1-20

Area of Activity

Automotive, Transportation & Related Services

Category

Water & Wastewater Industry/Analysis and quality control equipment

Brand

Mehrgan-Sanat

HS Code

9027

key specifications

The best way to achieve reliable results in the analysis of quality control parameters, stability, long equipment life and eliminating additional costs in a process is to carefully design the sampling system and use efficient analysis equipment. Studies show that nearly 60% of problems and shutdowns in power plants are caused by the presence of impurities in the water and their lack of correct identification and accurate analysis. The costs imposed by such shutdowns, which are caused by the lack of proper design and proper engineering and in the long run, double the cost to the system, cannot be ignored. Therefore, proper management of the analysis and sampling system leads to correct and accurate control of the process chemistry. As a result: * Elimination of unplanned shutdowns (forced plant shutdown) * Cost reduction (reduction in chemical consumption) * Reduction in service and maintenance costs

Product Specifications

Weight

1 Kilogram

Dimensions

NA

Sales and Pricing

Minimum order

1 Container

Payment Terms

NA

Delivery Terms

CPT

Lead Time

1 - 5 Days

Export Markets

Central Asia

Africa

USA

South America

Europe

Afghanistan

Turkey

China

Russia

Iraq

Persian Gulf Region

CIS Countries

India

Send a direct inquiry to this supplier